New:System Graph 2.0Learn more
🎯Testing Strategies

Run Load Tests on Critical Paths

Intermediate20 min readUpdated December 2024SREsQA Engineers

Validate system performance under realistic traffic patterns for your most important features.

Prerequisites

Before you begin, make sure you have:

  • A Zof account - Sign up free
  • Access to your code repository (GitHub, GitLab, or Bitbucket)
  • Node.js 18+ or Python 3.9+

What you'll achieve

By the end of this guide, you will have:

  • Installed and authenticated the Zof CLI
  • Connected Zof to your project
  • Run your first reliability test
  • Viewed results in the Zof dashboard

Step 1: Install the Zof CLI

Open your terminal and install the CLI globally:

bash
npm install -g @zof/cli

Verify the installation:

bash
zof --version

Expected result: zof/2.x.x

Step 2: Authenticate with Zof

Connect the CLI to your Zof account:

bash
zof login

This opens your browser to complete authentication. Once authorized, you'll see:

text
✓ Authenticated as your@email.com

Tip

Use a service account token for CI rather than your personal token. You can create one at Settings → API Tokens in the Zof dashboard.

Step 3: Initialize your project

Navigate to your project directory and initialize Zof:

bash
cd your-project
zof init

Zof creates a zof.config.json file with sensible defaults for your project type.

Step 4: Run your first test

Execute a quick validation:

bash
zof run --quick

This runs a subset of agents for fast feedback (full runs take longer but are more comprehensive).

Note

The --quick flag runs only smoke and sanity agents. Use zof run without flags for a comprehensive test.

Verify it works

  1. Open app.zof.ai
  2. Navigate to Results
  3. You should see your first test run with findings categorized by severity

You should see: A results summary showing reliability score, issues found, and test coverage.

Troubleshooting

Cause: Your session may have expired or been revoked.

Solution: Run zof logout followed by zof login to re-authenticate.

Cause: You're not in a project directory or zof init wasn't run.

Solution: Navigate to your project root and run zof init.

Cause: Running full suite instead of quick mode.

Solution: Use zof run --quick for faster feedback during development, or configure specific agents in zof.config.json.

Was this guide helpful?