Capture the original failure, authorized change scope, verification evidence and accountable approval.

Finding and authorization

Use this as a working template. Record an owner, evidence link, status (confirmed, pending, not applicable), and review date for every item. A checked box is not a certification or a substitute for reviewing the supporting evidence. Resolve critical unknowns before relying on the workflow.

  • Finding/reference: ____; application/version: ____; environment: ____; owner: ____.
  • Reproduction procedure and failing baseline evidence: ____.
  • Authorized repository/branch/files/actions: ____; excluded operations: ____.
  • Patch authoring, execution, review and deployment approvers: ____.

Review the proposed change

Evaluate the explanation and diff together. A changed assertion or suppressed error can hide the original problem.

  • Does the patch address the demonstrated failure without expanding beyond the approved scope?
  • Does it change authentication, authorization, data handling, public interfaces or dependencies?
  • Have generated test changes, migrations and configuration changes been reviewed?
  • Are assumptions, limitations and unresolved questions explicit?

Verify and decide

Use comparable baseline and candidate environments. Report incomplete work as incomplete.

  • Record the patch identifier, run identifiers, versions, inputs and expected results.
  • Run the original reproduction and representative adjacent/negative tests.
  • List passed, failed, skipped and inconclusive checks; explain any accepted gap.
  • Confirm that the evidence is reproducible and that reviewers can explain the behavior change.
  • Decision: approve / revise / reject; reviewer, date and reason: ____.

Deploy and recover

Deployment authorization remains a separate decision. A revert may not undo data changes or external side effects.

  • Deployment plan and authorized operator: ____; maintenance window if required: ____.
  • Rollback/recovery steps, data implications and verification procedure: ____.
  • Monitoring and post-deployment acceptance evidence: ____; incident owner: ____.
  • Final disposition and remaining follow-up work: ____.