Skip to content
🎯Testing Strategies

Run Load Tests on Critical Paths

Intermediate20 min read·Updated December 2024·SREsQA Engineers

Validate system performance under realistic traffic patterns for your most important features.

Prerequisites

Before you begin, make sure you have:

  • A Zof account - Sign up free
  • Access to your code repository (GitHub, GitLab, or Bitbucket)
  • Node.js 18+ or Python 3.9+

What you'll achieve

  • Installed and authenticated the Zof CLI
  • Connected Zof to your project
  • Ran your first reliability test
  • Viewed results in the Zof dashboard

Step 1: Install the Zof CLI

Open your terminal and install the CLI globally:

bash
npm install -g @zof/cli

Verify the installation:

bash
zof --version

Expected result: zof/2.x.x

Step 2: Authenticate with Zof

Connect the CLI to your Zof account:

bash
zof login

This opens your browser to complete authentication. Once authorized, you'll see:

text
✓ Authenticated as your@email.com

Tip

Use a service account token for CI rather than your personal token. You can create one at Settings → API Tokens in the Zof dashboard.

Step 3: Initialize your project

Navigate to your project directory and initialize Zof:

bash
cd your-project
zof init

Zof creates a zof.config.json file with sensible defaults for your project type.

Step 4: Run your first test

Execute a quick validation:

bash
zof run --quick

This runs a subset of agents for fast feedback (full runs take longer but are more comprehensive).

Note

The --quick flag runs only smoke and sanity agents. Use zof run without flags for a comprehensive test.

Verify it works

  1. Open app.zof.ai
  2. Navigate to Results
  3. You should see your first test run with findings categorized by severity

You should see: A results summary showing reliability score, issues found, and test coverage.

Troubleshooting

Was this guide helpful?

01Ọchịchị + onye isi visibiliti

Ndị isi akụkọ, ndị nyocha, na bọọdụ nwere ike iji.

Zof na-ewepụta akụkọ nlebanya ntọhapụ gị, ngwugwu ihe akaebe na-akwado ya na akwụkwọ ọgụgụ ndị isi chọrọ ugbua, n'usoro ị debere, yana usoro data agbakwunyere.

NDỊ ISI

Nchịkọta kwa izu

Hapụ ahụike n'otu echiche.

Nyocha-njikere

ngwugwu nnabata

  • SOC 2
  • ISO
  • ụzọ ihe akaebe.

USORO OGE

Haziri ya

Emepụtara na-akpaghị aka na nhazi oge gị.

AUDIT-READY/reports
Zof AI na-akọ ibe nwere kaadị ndebiri anọ, nchịkọta mwepụta kwa izu, ọnọdụ mkpuchi, mkpesa nyocha ihe ize ndụ, yana ngwugwu akaebe nnabata, nke ọ bụla nwere Mepụta na nhazi usoro, gbakwunyere taabụ maka akụkọ ewepụtara, nlele echekwara, na ahaziri.
Akụkọ · / mkpesa · ndebiri ụlọ ọrụ anọ · na-ebi na ngwaahịa a.
Guides | Zof AI