Skip to content
🎯Testing Strategies

Run Load Tests on Critical Paths

Intermediate20 min read·Updated December 2024·SREsQA Engineers

Validate system performance under realistic traffic patterns for your most important features.

Prerequisites

Before you begin, make sure you have:

  • A Zof account - Sign up free
  • Access to your code repository (GitHub, GitLab, or Bitbucket)
  • Node.js 18+ or Python 3.9+

What you'll achieve

  • Installed and authenticated the Zof CLI
  • Connected Zof to your project
  • Ran your first reliability test
  • Viewed results in the Zof dashboard

Step 1: Install the Zof CLI

Open your terminal and install the CLI globally:

bash
npm install -g @zof/cli

Verify the installation:

bash
zof --version

Expected result: zof/2.x.x

Step 2: Authenticate with Zof

Connect the CLI to your Zof account:

bash
zof login

This opens your browser to complete authentication. Once authorized, you'll see:

text
✓ Authenticated as your@email.com

Tip

Use a service account token for CI rather than your personal token. You can create one at Settings → API Tokens in the Zof dashboard.

Step 3: Initialize your project

Navigate to your project directory and initialize Zof:

bash
cd your-project
zof init

Zof creates a zof.config.json file with sensible defaults for your project type.

Step 4: Run your first test

Execute a quick validation:

bash
zof run --quick

This runs a subset of agents for fast feedback (full runs take longer but are more comprehensive).

Note

The --quick flag runs only smoke and sanity agents. Use zof run without flags for a comprehensive test.

Verify it works

  1. Open app.zof.ai
  2. Navigate to Results
  3. You should see your first test run with findings categorized by severity

You should see: A results summary showing reliability score, issues found, and test coverage.

Troubleshooting

Was this guide helpful?

01Nhyɛasoɔ + adwumayɛ ho akannidi nimdeɛ

Amanneɛbɔ a akannifoɔ, nhwɛfoɔ, ne bod no betumi de adi dwuma ankasa.

Zof yɛ amanneɛbɔ a wo nneɛma a wɔyi ho nhwɛmu, nhyɛasoɔ ho adanseɛ kotokuo, ne adwumayɛ ho akannidi nhwɛmu hia dada, wɔ bere a woahyɛ so, a data trail no ka ho.

ADWUMAYƐ HO AKANNIDI

Dapɛn biara nsɛm tiawa

Bode ho apɔwmuden wɔ hwɛbea baako.

NHYƐASOƆ-PƐ

Nhyɛasoɔ kotokuo

  • SOC 2
  • ISO
  • adanseɛ trail.

BERE

Wɔahyehyɛ

Wɔyɛ no ankasa wɔ wo bere a woahyɛ so.

AUDIT-READY/reports
Zof AI amanneɛbɔ krataa a ɛwɔ template kaad anan, Dapɛn Biara Nneɛma a Wɔyi Mua, Kɛsemu Nkɔso, Asiane Ho Nhwɛmu Amanneɛbɔ, ne Nhyɛasoɔ Ho Adanseɛ Kotokuo, a obiara wɔ Yɛ ne Hyehyɛ adeyɛ, ne tabs ma Amanneɛbɔ a Wɔayɛ, Nsɛm a Wɔakora, ne Nea Wɔahyehyɛ.
Amanneɛbɔ · /reports · enterprise template anan · ɛfiri produkt no mu tee.
Guides | Zof AI