ソフトウェアがどう
つながっているかを把握。
Zofはサービス、API、依存関係をマッピングし、変更時に何をテストすべきかをチームが把握できるようにします。
時系列
何が存在し、何が、いつ、誰によって変更されたか
影響範囲
アクションの実行前に特定
ポリシー
保護対象のシステムに関連付け
対象範囲を限定
承認されたシステムとアクセスに限定
Entities, relationships, and time
Repositories, commits, pull requests, services, APIs, endpoints, components, databases, tables, queues, infrastructure, environments, deployments, agents, models, tools, policies, controls, tests, evidence, incidents, owners, and data classifications.
- 01
Relationships that carry consequence
DEPENDS_ON, CALLS, READS, WRITES, DEPLOYS_TO, OWNED_BY, PROTECTED_BY, VERIFIED_BY, AFFECTS, GENERATED_BY, APPROVED_BY, USES_MODEL, USES_TOOL, SATISFIES, and VIOLATES.
- 02
Temporal by design
What exists, what changed, when it changed, who or what changed it, what depended on it, what evidence existed, what policies applied, what decision was made, and what happened afterward.
- 03
Blast radius before action
Every proposed change resolves to affected systems, criticality tier, applicable controls, historical incidents, and the verification required.
- 04
Shared by the whole loop
Verification, evidence, and control all read from the same graph, so every decision is grounded in one understanding of the enterprise.
チームが測定する成果
Size the blast radius before shipping
See exactly which systems, data, and customers a change can affect, and how critical they are, before it is allowed to run.
Tier 0
criticality resolvedRequire the right verification
Controls mapped to affected systems determine the evidence a change must produce, so verification is targeted rather than exhaustive.
Policy
selects the evidenceReconstruct any decision
Walk back from an incident to the change, the evidence that existed, the policies that applied, and who approved it.
Temporal
history stays queryableGive leadership one risk view
One graph shows where risk concentrates, where controls apply, and what changed recently.
One
source of truth
The substrate of the control loop
The System Graph is not a standalone feature. Verification reads it to decide what must be proven, Evidence writes to it, and Control relies on it to size risk.
Verification Engine
Selects the evidence each change requires from the systems and controls the graph resolves.
Evidence
Every bundle, approval, and outcome is written back to the graph, so history is queryable.
Control Plane
Policy decisions are grounded in criticality, affected systems, and incident history from the graph.
- 自社の制御レイヤーの下で継続的に検証
- System Graphが変更のリリース前に依存関係をマッピング
- コンプライアンス審査に向けた監査水準の証拠
自社のSystem Graphを見る
Reliability Sprintをご予約いただくと、Zofは停止が許されないシステムをひとつマッピングし、重要な経路とリスクの所在を特定し始めます。
- アクセスと対象範囲を確認
- 重要なシステムをひとつ評価
- プライベートデプロイメントのオプション
何が変わったかを把握する。何をテストすべきかを把握する。
トポロジーを認識した影響分析が、サービスの変更を影響を受けるワークフローに結び付け、システム依存関係に基づいて検証計画を推奨します。
システムコンテキストを活用して検証の優先順位を決める。
