了解您的軟體如何
相互連接。
Zof 為您的服務、API 和相依關係建立對應圖,讓團隊在發生變更時知道需要測試什麼。
時序
有哪些項目、哪些項目改變了、何時改變以及由誰改變
影響範圍
在操作執行前確定
政策
對應至其保護的系統
限定範圍
限定於獲准的系統與存取權限
Entities, relationships, and time
Repositories, commits, pull requests, services, APIs, endpoints, components, databases, tables, queues, infrastructure, environments, deployments, agents, models, tools, policies, controls, tests, evidence, incidents, owners, and data classifications.
- 01
Relationships that carry consequence
DEPENDS_ON, CALLS, READS, WRITES, DEPLOYS_TO, OWNED_BY, PROTECTED_BY, VERIFIED_BY, AFFECTS, GENERATED_BY, APPROVED_BY, USES_MODEL, USES_TOOL, SATISFIES, and VIOLATES.
- 02
Temporal by design
What exists, what changed, when it changed, who or what changed it, what depended on it, what evidence existed, what policies applied, what decision was made, and what happened afterward.
- 03
Blast radius before action
Every proposed change resolves to affected systems, criticality tier, applicable controls, historical incidents, and the verification required.
- 04
Shared by the whole loop
Verification, evidence, and control all read from the same graph, so every decision is grounded in one understanding of the enterprise.
團隊衡量的成果
Size the blast radius before shipping
See exactly which systems, data, and customers a change can affect, and how critical they are, before it is allowed to run.
Tier 0
criticality resolvedRequire the right verification
Controls mapped to affected systems determine the evidence a change must produce, so verification is targeted rather than exhaustive.
Policy
selects the evidenceReconstruct any decision
Walk back from an incident to the change, the evidence that existed, the policies that applied, and who approved it.
Temporal
history stays queryableGive leadership one risk view
One graph shows where risk concentrates, where controls apply, and what changed recently.
One
source of truth
The substrate of the control loop
The System Graph is not a standalone feature. Verification reads it to decide what must be proven, Evidence writes to it, and Control relies on it to size risk.
Verification Engine
Selects the evidence each change requires from the systems and controls the graph resolves.
Evidence
Every bundle, approval, and outcome is written back to the graph, so history is queryable.
Control Plane
Policy decisions are grounded in criticality, affected systems, and incident history from the graph.
- 在您的控制層下持續驗證
- System Graph 在變更發布前對應相依關係
- 供合規審查使用的稽核級證據
查看您自己的 System Graph
預約 Reliability Sprint,Zof 將開始建立一個您無法承受其失效的系統對應圖,識別關鍵路徑和風險暴露的位置。
- 審查存取權限和範圍
- 評估一個關鍵系統
- 私有部署選項
掌握變更內容,掌握測試對象。
具拓撲感知的影響分析會將服務變更與受影響的工作流程連結起來,並依系統相依關係推薦驗證計畫。
運用系統脈絡來排定驗證優先順序。
