Ga yadda manhajarka
take da alaƙa da sauran sassa.
Zof yana taswirar ayyukan sabis ɗinka, APIs, da abubuwan dogaro, domin ƙungiyarka ta san abin da za ta gwada idan wani abu ya canja.
Na lokaci
abin da ke akwai, abin da ya canja, lokacin da ya canja, da wanda ya canja shi
Faɗin tasiri
an tantance kafin a aiwatar da aikin
Manufofi
an danganta su da tsare-tsaren da suke karewa
An ayyana iyaka
zuwa tsare-tsaren da aka amince da su da damar shiga da aka ba izini
Entities, relationships, and time
Repositories, commits, pull requests, services, APIs, endpoints, components, databases, tables, queues, infrastructure, environments, deployments, agents, models, tools, policies, controls, tests, evidence, incidents, owners, and data classifications.
- 01
Relationships that carry consequence
DEPENDS_ON, CALLS, READS, WRITES, DEPLOYS_TO, OWNED_BY, PROTECTED_BY, VERIFIED_BY, AFFECTS, GENERATED_BY, APPROVED_BY, USES_MODEL, USES_TOOL, SATISFIES, and VIOLATES.
- 02
Temporal by design
What exists, what changed, when it changed, who or what changed it, what depended on it, what evidence existed, what policies applied, what decision was made, and what happened afterward.
- 03
Blast radius before action
Every proposed change resolves to affected systems, criticality tier, applicable controls, historical incidents, and the verification required.
- 04
Shared by the whole loop
Verification, evidence, and control all read from the same graph, so every decision is grounded in one understanding of the enterprise.
Sakamakon da ƙungiyoyi suke aunawa
Size the blast radius before shipping
See exactly which systems, data, and customers a change can affect, and how critical they are, before it is allowed to run.
Tier 0
criticality resolvedRequire the right verification
Controls mapped to affected systems determine the evidence a change must produce, so verification is targeted rather than exhaustive.
Policy
selects the evidenceReconstruct any decision
Walk back from an incident to the change, the evidence that existed, the policies that applied, and who approved it.
Temporal
history stays queryableGive leadership one risk view
One graph shows where risk concentrates, where controls apply, and what changed recently.
One
source of truth
The substrate of the control loop
The System Graph is not a standalone feature. Verification reads it to decide what must be proven, Evidence writes to it, and Control relies on it to size risk.
Verification Engine
Selects the evidence each change requires from the systems and controls the graph resolves.
Evidence
Every bundle, approval, and outcome is written back to the graph, so history is queryable.
Control Plane
Policy decisions are grounded in criticality, affected systems, and incident history from the graph.
Tabbatarwa ƙarƙashin kulawa tare da amincewar ɗan adam a kowane muhimmin mataki.
- Tabbatarwa mai ci gaba ƙarƙashin sashen sarrafawarku
- System Graph yana zana taswirar dogaro kafin a saki canje-canje
- Shaida mai dacewa da tantancewa don nazarin bin ƙa'idoji
Duba System Graph naka
Yi ajiyar Reliability Sprint, kuma Zof zai fara taswirar tsarin guda wanda ba za ka iya jure gazawarsa ba, yana gano hanyoyi masu muhimmanci da inda barazana take.
- Nazari kan damar shiga da iyakar aiki
- Tantance tsarin guda mai muhimmanci
- Zaɓuɓɓukan turawa na sirri
Masu Alaƙa
Bincika yadda System Graph ke ƙarfafa sauran fasalolin dandamali
San abin da ya canza. San abin da za a gwada.
Nazarin tasiri mai sanin tsarin yana haɗa canje-canjen sabis da ayyukan da abin ya shafa kuma yana ba da shawarar tsare-tsaren tabbatarwa bisa ga dogaron tsarin.
Yi amfani da yanayin tsarin don ba da fifiko ga tabbatarwa.
