Hwɛ sɛnea wo softwea
ka bom.
Zof yɛ wo nnwuma, API, ne nea ɛde wɔn ho to so ho mfonini, na wo kuw ahu nea ɛsɛ sɛ wɔsɔ hwɛ bere a biribi sesa.
Bere ne abakɔsɛm
nea ɛwɔ hɔ, nea asesa, bere bɛn, ne hena na ɔyɛe
Baabi a nsunsuanso du
wɔkyerɛ ansa na wɔadi adeyɛ no ho dwuma
Mmara
wɔde bata nhyehyɛe a ɛbɔ ho ban ho
Wɔakyerɛ ahye
ma nhyehyɛe ne hokwan a wɔapene so
Entities, relationships, and time
Repositories, commits, pull requests, services, APIs, endpoints, components, databases, tables, queues, infrastructure, environments, deployments, agents, models, tools, policies, controls, tests, evidence, incidents, owners, and data classifications.
- 01
Relationships that carry consequence
DEPENDS_ON, CALLS, READS, WRITES, DEPLOYS_TO, OWNED_BY, PROTECTED_BY, VERIFIED_BY, AFFECTS, GENERATED_BY, APPROVED_BY, USES_MODEL, USES_TOOL, SATISFIES, and VIOLATES.
- 02
Temporal by design
What exists, what changed, when it changed, who or what changed it, what depended on it, what evidence existed, what policies applied, what decision was made, and what happened afterward.
- 03
Blast radius before action
Every proposed change resolves to affected systems, criticality tier, applicable controls, historical incidents, and the verification required.
- 04
Shared by the whole loop
Verification, evidence, and control all read from the same graph, so every decision is grounded in one understanding of the enterprise.
Aba a akuw susuw
Size the blast radius before shipping
See exactly which systems, data, and customers a change can affect, and how critical they are, before it is allowed to run.
Tier 0
criticality resolvedRequire the right verification
Controls mapped to affected systems determine the evidence a change must produce, so verification is targeted rather than exhaustive.
Policy
selects the evidenceReconstruct any decision
Walk back from an incident to the change, the evidence that existed, the policies that applied, and who approved it.
Temporal
history stays queryableGive leadership one risk view
One graph shows where risk concentrates, where controls apply, and what changed recently.
One
source of truth
The substrate of the control loop
The System Graph is not a standalone feature. Verification reads it to decide what must be proven, Evidence writes to it, and Control relies on it to size risk.
Verification Engine
Selects the evidence each change requires from the systems and controls the graph resolves.
Evidence
Every bundle, approval, and outcome is written back to the graph, so history is queryable.
Control Plane
Policy decisions are grounded in criticality, affected systems, and incident history from the graph.
Nhwehwɛmu a ɛhyɛ sohwɛ ase a onipa pene so wɔ anammɔn titiriw biara mu.
- Nhwehwɛmu a ɛkɔ so daa wɔ wo sohwɛ nhyehyɛe ase
- System Graph kyerɛ nneɛma a egyina afoforo so ansa na wɔde nsakrae adi dwuma
- Adanse a ɛfata akontaabu nhwehwɛmu ma mmara ne nhyehyɛe di-so nhwehwɛmu
Hwɛ w'ankasa System Graph
Hyɛ Reliability Sprint bere na Zof afi nhyehyɛe baako a wo ntumi mma ɛnni nkogu ho mfonini ase, akyerɛ akwan a ɛho hia ne baabi a asiane da.
- Hwehwɛ kwan a wɔma ne adwuma no ano hye mu
- Susuw nhyehyɛe titiriw baako ho
- Kokoam adwuma beae a wobetumi apaw
Deɛ ɛbata ho
Hwehwɛ sɛdeɛ System Graph no ma platform feature afoforɔ tumi
Nim deɛ asesa. Nim deɛ sɛ wɔhwɛ.
Topology-tia impact analysis toa service sesa ne adwumayɛ a abuu so no ano na ɛkyɛ validation plans a wɔde system ho ndepemde bɔ.
De system ho nsɛnkyerɛnne di ɔkannidie wɔ validation.
