Ugrás a tartalomhoz

Archived recording, retained for reference. Capabilities may differ from the current platform.

Browse current videos
← Archive
Archive

Moving Beyond Manual QA Gates in 2025

Archived perspective on transitioning from manual QA gates to continuous validation with governed verification. Retained for historical reference; not representative of current positioning.

0:51General engineering audience
0:51
Key takeaways

What you will learn

  • Manual gates do not scale with modern release cadences.
  • Continuous validation requires governed verification orchestration.
  • Enterprise teams balance automation with human-authorized remediation.

Related sessions

Events and explainers from the same topic area.

Next step

See the current Zof AI platform

Schedule a briefing on today’s governed autonomous reliability, continuous verification, and enterprise validation.

01Zof Console

Egy felület a testtartáshoz, a műveletekhez és a további figyelmet igénylő dolgokhoz.

A hitelesített otthon, amelyet a mérnöki, QA- és SRE-csapatok minden nap megnyitnak: minőségi állapot, folyamatban lévő futtatások, modulonkénti lefedettség, és ami legközelebb figyelmet igényel.

MŰKÖDÉSI KPI-k

  • Futások
  • Lefedettség
  • Kockázat

Éljen minden olyan környezetben, ahová szállít.

MUNKAGERINCS

  • Specifikációk
  • Tesztek
  • Menetrendek

A specifikációtól az ütemezett regresszióig.

VÉDŐKÉPEK

  • RBAC
  • SSO
  • audit

Minden olyan cselekedet, amely egy megnevezett embernek tulajdonítható.

LIVE/console
A Zof kezdőoldali irányítóközpontja 12 futtatást mutat 94% sikerességgel, 3 nyitott kritikus problémát, 84% lefedettséget, négy modul nyomonkövetési sávját, a specifikációs folyamatot, a közelgő ütemezéseket és az ajánlott következő műveleteket, aktív futtatásokat mutató oldalsávval.
Példa a konzol kezdőlapjára · Checkout Service · Előkészítési környezet.